Percent Blowdown

%B=BM×100\%B = \frac{B}{M} \times 100

Worked example: 20 L/min bleed against 30 gpm makeup → 17.61% — press Try an example to run it live, then adjust anything.

Enter your known values, leave one input blank, and solves for the missing one. Tap a variable’s symbol to see what it means, with a typical value. Try different units for next level excitement!

Learning zone

Percent Blowdown explained

MB%B

Percent blowdown is cycles of concentration turned inside out: since COC = M/B, the blowdown share of makeup is simply 100/COC. Five cycles means 20% of every gallon you buy goes down the drain untouched; ten cycles means 10%. Plant managers understand the percentage far faster than they understand cycles, and it is the number that belongs on a water-conservation report.

Use it as a sanity check on a service call. Meter the makeup for an hour, meter the bleed, and if the bleed is running 33% you are at three cycles no matter what the controller display claims — usually because the bleed solenoid is passing, the conductivity probe is fouled with biofilm and reading low, or someone left the manual bypass cracked open. A stuck-open bleed valve is the single most common cause of a mysteriously high water bill on a tower, and this one ratio finds it in ten minutes.

Percent Blowdown formula

%B=BM×100\%B = \frac{B}{M} \times 100
Where
  • %B\%B= Percent blowdown (%)
  • BB= Blowdown rate (L/min)
  • MM= Makeup water rate (L/min)

Missing one of these? Work it out first, then come back