Concrete Volume with Waste Allowance

Also known as how much concrete to order · cubic yards of concrete

V=L W T(1+w100)V = L\,W\,T\left(1 + \frac{w}{100}\right)

Worked example: 12.5 m³ over an 8 × 5 m pad with 25 % waste → 0.25 m thick — press Try an example to run it live, then adjust anything.

Enter your known values, leave one input blank, and solves for the missing one. Tap a variable’s symbol to see what it means, with a typical value. Try different units for next level excitement!

Here the solver did the work — could you?

Ordering the material →

UniversityApplied Field Engineering

Test your skills in the Exam Room: new numbers every attempt — free lessons for students, no sign-up, just pure learning.

See your Report Card
Compete with your friends
share your results
Learning zone

Concrete Volume with Waste Allowance explained

VLWTw

Ready-mix is sold by the cubic yard and delivered in trucks that hold eight to eleven of them, and the driver will not wait while you find a fourth of a yard. Hence the waste allowance: 5 % on a formed slab poured on polyethylene, up to 10 % on footings dug in soft ground where the trench over-excavates itself, and more on a rough-graded subgrade. The 27 in the conversion is the whole game — a cubic yard is 27 ft³ — so a 6 in slab is 0.5 ft thick and 54 ft² of it makes exactly one yard.

A worked example: a 40 ft × 30 ft driveway at 6 in thick is 40 × 30 × 0.5 = 600 ft³ = 22.2 yd³ neat; with 5 % waste, order 23.3 yd³, which in practice means calling for 23.5 yd³ since most suppliers sell in quarter-yard steps. The classic error is entering thickness in inches alongside feet — formula.expert converts for you, but on a napkin a 6 becomes a 12-fold overpour.

Concrete Volume with Waste Allowance formula

V=L W T(1+w100)V = L\,W\,T\left(1 + \frac{w}{100}\right)
Where
  • VV= Concrete to order (yd³)
  • LL= Length (m)
  • WW= Width (m)
  • TT= Thickness or depth (mm)
  • ww= Waste allowance (%)