Arps Exponential Decline Curve (Well Rate over Time)
Industrial EngineeringChemical EngineeringThe simplest of Arps' three decline curves: the well loses the same fraction of its rate every unit of time, so the rate falls on a straight line when plotted on a log scale. It is the b = 0 limit of the hyperbolic curve and is the curve that fits a well in boundary-dominated flow with a fixed bottom-hole pressure, and the tail on which long hyperbolic forecasts are usually finished. The decline rate D_i here is the nominal rate, the continuous one that sits in the exponent. It is not the effective rate that operators often quote, the fraction lost over one year, which is smaller: an effective decline of 30 percent a year is a nominal decline of 0.357 per year, because the rate is multiplied by 0.70 over the year and 0.70 is e to the power of minus 0.357. Time and the decline rate must be in the same unit. A well at 1 000 barrels a day with D_i = 0.357 per year is at 700 after one year and 490 after two. The same curve describes radioactive decay and any other first-order loss; this page keeps the oil and gas names and the decline-rate convention.
Arps Harmonic Decline Curve (Well Rate over Time)
Industrial EngineeringChemical EngineeringThe slowest of Arps' three decline curves: the rate falls as the reciprocal of one plus the product of the decline rate and the time, so the decline rate itself falls as the well ages and the curve is flatter than the exponential at long times. It is the b = 1 limit of the hyperbolic curve. At D_i t = 1 the rate has halved, at D_i t = 9 it is a tenth of the start. Time and the decline rate must be in the same unit: 1.44 per year goes with years and 0.12 per month with months. A well at 1 000 barrels a day with D_i = 0.5 per year is at 500 after two years and at 250 after six. The harmonic curve is a risky one for forecasting, because its total volume has no limit: the area under the curve grows without bound as the logarithm of time, so a forecast has to be stopped at an economic limit. Early data often cannot tell the harmonic curve from the exponential one: in the example Fetkovich worked in 1980 from Arps' own data, a limit of 20 barrels a month gave a life of 285 months on the exponential curve and 1 480 months on the harmonic.
Arps Hyperbolic Decline Curve (Well Rate over Time)
Industrial EngineeringChemical EngineeringHow the flow from an oil or gas well falls with time once it is on decline, in the form J. J. Arps published in 1945. The well starts at a rate q_i and loses a fraction D_i of its rate per unit time at the start (the initial nominal decline rate). The exponent b says how fast that decline rate itself slows as the well ages: at b = 0 it never slows and the curve is exponential, at b = 1 it slows as fast as it can and the curve is harmonic, and between the two, the classical range of b from 0 to 1, the curve is the hyperbola this page solves. The exponential and harmonic curves are separate pages because b = 0 and b = 1 are limits of this formula, not values it can take. Time and the decline rate must be in the same unit: 0.12 per month goes with months and 1.44 per year with years. A well that starts at 1 000 barrels a day with D_i = 0.5 per year and b = 0.5 is down to 444 barrels a day after two years. A fitted b above 1 turns up for wells whose early flow is still transient, such as wells in very tight rock; the page allows it, with the caution that such a curve gives an unbounded total volume and must be ended by an economic limit or a switch to exponential decline.
Capital Recovery Factor
Industrial EngineeringMoney & BusinessFraction of a capital sum that must be recovered each year to repay it with interest over n years. Multiply a first cost by CRF and you get its annual equivalent.
Defects Per Million Opportunities (DPMO)
Industrial EngineeringDefect rate on a scale that makes very good processes comparable: defects found, divided by the units inspected times the chances to go wrong on each unit, scaled to a million.
Economic Order Quantity (Wilson EOQ)
Industrial EngineeringMoney & BusinessOrder size that minimises the sum of ordering cost and holding cost: the square root of twice the annual demand times the cost per order, divided by the annual cost of holding one unit.
Equivalent Annual Cost
Industrial EngineeringMoney & BusinessTotal yearly cost of owning and running an asset: the capital cost spread over its life at interest, plus the annual operating cost. The right way to compare a cheap machine that lasts five years with an expensive one that lasts fifteen.
Inventory Turnover Ratio
Industrial EngineeringMoney & BusinessHow many times a year the stockroom empties and refills: cost of goods sold divided by the average value of inventory on hand.
Line Balancing Efficiency
Industrial EngineeringFraction of paid station time that is actually working: total task time divided by the stations you staffed times the cycle time. What is left over is balance delay.
Little's Law (Work in Process)
Industrial EngineeringThe most general law in operations: the work sitting in a system equals the rate it flows through times how long each job stays. True for any stable system, whatever the arrival pattern.
Machine Utilisation
Industrial EngineeringShare of the time a machine was actually running: operating time divided by the time it was available to run. The answer depends entirely on which hours you count as available.
Net Present Value of a Uniform Annual Cash Flow
Industrial EngineeringMoney & BusinessWorth of a project today when it costs C0 up front and returns the same net amount every year for n years: the discounted value of the series, less what it cost to start.
Overall Equipment Effectiveness (OEE)
Industrial EngineeringThe single number total productive maintenance is built on: availability times performance times quality. Three losses multiplied, never averaged.
Process Capability (Cp)
Industrial EngineeringHow the tolerance band compares with the spread of the process: the width of the specification divided by six standard deviations. Says nothing about whether the process is centred.
Process Capability Index (Cpk)
Industrial EngineeringCapability measured to the nearer specification limit, so an off-centre process is penalised: the smaller of the two one-sided indices. Cpk can never exceed Cp, and equals it only when the process is perfectly centred.
Reorder Point
Industrial EngineeringStock level that should trigger the next order: the quantity consumed during the supplier's lead time, so the last unit leaves the shelf as the replacement arrives.
Rolled Throughput Yield
Industrial EngineeringFraction of units that pass every step of an n-step process with no rework, when each step has the same first-pass yield: the yield raised to the number of steps.
Safety Stock (Statistical Buffer)
Industrial EngineeringBuffer that absorbs demand variability over the lead time: a service-level z value times the standard deviation of daily demand times the square root of the lead time in days.
Standard Time from a Time Study
Industrial EngineeringTurns a stopwatch reading into an allowed time: observed time, adjusted for how fast the operator was working, then padded for rest, personal needs and unavoidable delay.
Takt Time
Industrial EngineeringThe pace the customer sets: available production time in a period divided by the units the customer wants in that period. One unit must leave the line every takt.
Theoretical Minimum Number of Stations
Industrial EngineeringFewest workstations a line could possibly need: total work content divided by the cycle time. Round the answer UP to the next whole station: the fraction cannot be staffed.
Wright's Learning Curve (Unit Time)
Industrial EngineeringTime to build the nth unit when every doubling of cumulative output cuts the time to a fraction b of what it was: the aircraft-industry curve that still prices first-of-a-kind work.
X-bar Chart Upper Control Limit
Industrial EngineeringUpper control limit of an X-bar chart, built from the average range rather than a computed sigma: grand average plus the tabulated A2 factor times the average range. The lower limit is the same product subtracted.